logo
Aperçu ProduitsEn-tête de vapeur de chaudière

Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing

Certificat
Chine Jiangsu Sat-Cham Energy Technology Co., Ltd. certifications
Chine Jiangsu Sat-Cham Energy Technology Co., Ltd. certifications
Je suis en ligne une discussion en ligne

Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing

Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing
Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing

Image Grand :  Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing

Détails sur le produit:
Lieu d'origine: Chine
Nom de marque: SAT-CHAM
Certification: ISO CE
Numéro de modèle: Tête de chaudière
Conditions de paiement et expédition:
Quantité de commande min: 1 ensemble
Prix: Négociable
Détails d'emballage: Emballage en état de navigabilité
Délai de livraison: 30 jours
Conditions de paiement: LC, T/T, Western Union
Capacité d'approvisionnement: 500 tonnes par mois

Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing

description de
Pression: Haute pression Style: Horizontal
Carburant: À charbon Résistance à la corrosion: 3 mm
Plage de poids: 100kg à 5000kg fabricant: Compagnie Sat-Cham
Usage: Industriel Traitement de surface: Peint
Mettre en évidence:

heavy duty boiler steam header

,

high pressure boiler steam header

,

6300 tonne capacity steam header

Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler
4. Hydraulic test report: ensure the standard working pressure and safety

What is your maximum forging capacity?
Answer: Our equipment can handle the following specifications:

1.Maximum weight: Up to 65 tonnes per piece

2.Maximum length: Over 12 meters

3.Press capacity: Up to 6,300 tonnes

4.Both open-die forging and closed-die forging are available


Product Description:
In order to improve the boiler efficiency, the header boiler is gradually developed into a tube boiler to increase the heat
transfer area. The boiler water flows from the drum to the lower box through the downcomer, and it distributed to each tube bundle by the box. The water in these tube bundles continuously absorbs heat energy, and then flows back to the drum after being collected into the upper header. The upper and lower header are called headers. The header is an important part of the boiler, which is divided into upper header and lower header.

Specification:
Diameter(OD)
¢76mm~¢914mm
Length(Max)
23000mm
Temperature(℃)
300~1500
Brand
SAT-CHAM

 
 

Application:
 
air cooler, fired heater, heat exchanger, marine boiler, economizer, power plant boiler, HRSG boiler, waste heat recovery unit, air heater etc
 
Characteristic:1.Anti-corrosion2.Anti-wear3.Lower contact resistance 4.Higher Stability
Our products can be modified according to our customers' needs and the situation.we design and manufacture safe,reliable and efficient H-fin tubes.it has also completed stand-alone product quality assurance systems.Production of H-fin tubes are with high heat transfer efficiency, they have flue gas resistance and are designed for a small space.

Technical parameters The high degree of fin 0-16mm(or outside diameter of fin φ25-φ75);
Pitch of fins 2.0-5.0mm; Length of finning tube 0.5~ 14m.
Single metal rolling finning tube Pure aluminum 1060 or aluminum alloy 6063,6061.
Outside diameter Shall be less than 40mm
Double metal rolling finning tube Tube-based protection from the outer layer of aluminum
tubes,corrosion-resistant,Tube-based can be made of carbon steel pipe,in addition to,stainless
steel tube and copper tube can also be used, as well as titanium alloy tube
Package The aluminum finned tubes are well packed in plastic film in the inner and steel fram
in the outer



FAQ:

Q1: How long is the warranty period?
We provide 18 months warranty for all spare parts(exclude fragile parts).

Q2: How can we guarantee quality?
1 All machines are in strict accordance with the ISO quality and CE system requirements.
2 Each procedure is crafted by professional Skilled labour, followed by particular QC
3 All information of our products can be checked in efficient management system.

Q3: What can you buy from us?
Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall,
Boiler manifold headers and other pressure spare parts.

Q4: What kind of service do you provide?
Before sales:
Provide productinformations, market research forecasting, product customization,product processing,consultation and other services for your convenience.

Q5: Are you a factory or trading company, where are you located?
We are a factory, just 130km(2 hours by car) away from Shanghai Airport.
We offer pickup service at Shanghai for your visit.
Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing 0
Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing 1
Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing 2
Heavy Duty Boiler Steam Header Capable of Withstanding High Pressure Up to 6300 Tonnes with Comprehensive Control Testing 3

Coordonnées
Jiangsu Sat-Cham Energy Technology Co., Ltd.

Personne à contacter: Mr. Chen

Téléphone: +8615150235238

Envoyez votre demande directement à nous (0 / 3000)